TRILITICA FRAME


February 27, 2009

Redesign Of 11 Storied Apartment Building

We started to redesign the 11 storied apartment building.

The new apartments will be smaller than the previous ones.

September 9, 2008

Building Collapses in Romania Due to Deep Excavations (Video)

Filed under: Building and Construction Industry In Romania — admin @ 2:26 pm


The above video is filmed by an amateur cameraman in Galati, Romania.

On a construction site, deep excavations with no support measures to stabilize the soil led to the collapse of neighbour building. (more…)

July 30, 2008

Building in Romania - Constructions and Design Conditions

Filed under: Building Design, Building Permit Project, Building and Construction Industry In Romania, Technical Building Design — Trilitica Frame Architects and Engineers @ 3:34 pm

Urban Certificate, Building Permit in Romania, Constructions conditions and more

How  to obtain a  Building  Permit in Romania.  What  Professionals are involved  during  both design and construction phases. (more…)

Architecture and Engineering Technical Drawings and Specifications Content according Romanian Practice

Architecture and Engineering Technical Drawings and Specifications Content according Romanian Practice

1.1. Design Theme / Feasibility Study:

1.1.1. Architecture

1.1.1.1. All Stories blueprints

1.1.1.2. Sections Views

1.1.1.3. Exterior Renderings

1.1.1.4. Cost Estimation Sheets (more…)